Sunday, April 12, 2009

almost frozen site plan not so good







hi folks.












Have done an updated analysis on the almost frozen scheme, and there are soe major topological changes from the structure plans sketched earlier. Unfortunately, these changes reduce the overall integration of the scheme, and draw integration outside the site, away from our social hub.






Compare the two sketches, the one above is the latest scheme, and the most interactive space is the vehicular road leading to all the parking lots. The main changes here are lost connectivity between the bridge and the main entrance, and lost connectivity between the two entrances.









Please refer below sketch (previous scheme) which gets a much greater degree of integration in the academic (social hub). Also attached is a sketch identifying the key (magenta) routes and the secondary (cyan) routes in terms of pedestrian movement.






thanks



























1 comment:

  1. Some of the connections have not been interpreted /drawn correctly in the latest analysis. I think we need to chat before analysisng the frozen site plan.

    ReplyDelete

Note: Only a member of this blog may post a comment.